Recent Projects

Leicester Hotel                           

Ceiling works completed on a new build hotel in leicester with 3000m2 of SAS 320 metal ceiling tiles to corridor and bedrooms                                                                                                               

 

Leicester Hotel                           

Ceilings Works to Resturaunt and Meeting areas with 800m2 of bespoke Troldtekt Ceilings installed and Hygeinic ceilings installed to kitchen areas including 400m2 of Altro Whiterock Hygienic cladding to wall surfaces .                                     

 

Office Refurbishment Oxfordshire

Partition, Ceiling and Flooring Works undertaken to a modern state of the art office enviroment including acoustic baffles to office areas. Three floor office refurbished including all corridor and welfare areas.

 

Industrial Unit Middlesbrough

Refurbishment of a upstairs storage space in an industrial unit in middelesbrough to convert the area to a modern office space with welfare facilities. Partitions, Ceilings and flooring works undertaken.

Sheffield Offices

Refurbishment of a existing office block in sheffield with Partitions, Ceilings and flooring works undertaken to a 2000m2 area.                                                       

Hylton Castle Sunderland

Restoration of a listed 14th century castle with partition and Ceiling works undertaken to give the castle a modern internal look fused with the existing building.          

Manchester Offices

Ceiling works undertaken on a large new build office project in the heart of manchester city centre. 6500m2 of SAS 330 ceilings installed to create a modern office enviroment.                                                                                                  

Middlesbrough School             

Full refurbishment of a disused middlesbrough school prior to reopening with 600m2 of hardwall and skim to existing walls and 700m2 of new ceilings installed throughout including Quattro 47 acoustic ceilings to the main hall.              

Manchester Hotel

Ceilings works completed on a new build hotel in manchester city centre with 2000m2 of bespoke Metal SAS 330 ceilings installed to corridors and bedrooms. Hygienic ceilings installed to kitchen areas including 300m2 of altro whiterock cladding to walls.

Here's where you can enter in text. Feel free to edit, move, delete or add a different page element.